Can one contractor replace roofing, siding, and gutters together in Metro Detroit?

Short answer

Yes. One contractor can replace your roofing, siding, and gutters together in Metro Detroit, provided they hold the proper state credentials. Under Michigan law, residential maintenance and alteration licenses classify roofing (Code M), siding (Code K), and gutters (Code O) as specific trades. A licensed contractor can legally handle them together when the work is incidental and supplemental to their primary craft. Any exterior project costing $600 or more in combined labor and materials requires this state licensure.

Source: Horizon Roofing & Construction, https://horizonroofingconstruction.com/blog/can-one-contractor-replace-roofing-siding-and-gutters-together-in-metro-detroit

Tradesperson installs metal flashing along an asphalt shingle roofline and unfinished house wall siding.
In Michigan, a person may engage in work as a residential builder or residential maintenance and alteration contractor without a license if the aggregate contract price for labor, material, and…

Michigan Licensing Framework for Combined Exterior Trades#

A single contractor can handle your roof, siding, and gutters on the same project in Metro Detroit. But only if their credentials meet state guidelines. Under Michigan law, a residential maintenance and alteration contractor undertakes repairs, alterations, additions, or improvements to residential structures for compensation (michigan.gov). The state issues specialty licenses for individual exterior trades, identifying them by specific trade codes such as roofing (Code M), siding (Code K), and gutters (Code O) (cheboygancounty.net). Michigan statute MCL 339.2404 specifically includes roofing alongside siding and gutters within this licensing structure (legislature.mi.gov).

The law does not force homeowners to hire three separate crews. Michigan statutory provisions state that a specialty contractor is not prohibited from executing a contract that involves other crafts, as long as that extra work is incidental and supplemental to the contractor's licensed trade (legislature.mi.gov). This provision allows a properly licensed exterior contractor to manage all three trades under one roof.

Exterior trade licensing
  1. Code M: Roofing
  2. Code K: Siding
  3. Code O: Gutters

Treating roofing, siding, and gutters as separate contracts often creates a liability trap where critical joints, such as step flashing and kick-out intersections, fall between trade jurisdictions. Managing these trades under a unified agreement keeps structural responsibilities tied to a single team. This holds true on major exterior rehabilitations where all elements interact directly. It does not apply if a project involves entirely unrelated structural trades that exceed the incidental and supplemental framework established by the state (legislature.mi.gov).

Municipal Permitting and Exemption Thresholds in Metro Detroit#

A building inspector and contractor inspect the roofline and soffits of a two-story home under renovation.

Exterior projects across Michigan must comply with local permit requirements and code enforcement. In Michigan, building code enforcement is administered by the state, the county, or local municipal agencies, which means permit applications must be submitted directly to the enforcing agency holding local jurisdiction (michigan.gov). In the City of Detroit, for example, contractors applying for a residential building permit must hold an active builder's license and maintain current City registration (detroitmi.gov).

Homeowners often ask when a license is legally required. Because a comprehensive exterior project easily exceeds this $600.00 (michigan.gov) limit, unlicensed work on full replacements is illegal under state statute.

Local code enforcement rules highlight a common trade-off when bundling permits:

  • The City of Detroit, for example, requires official contractor registration and a builder's license before releasing residential building permits (detroitmi.gov).

  • In Michigan, building code enforcement can be handled by the state, county, or local government, requiring applications to go through the appropriate agency (michigan.gov).

Navigating multiple building departments across Metro Detroit means homeowners must verify whether an exterior contractor pulls bundled permits correctly. Securing verified permits ensures that the appropriate enforcing agency can inspect the work under applicable building codes (michigan.gov).

Roof Runoff Management and Wall Drainage Planes#

When severe weather hits Southeast Michigan, your exterior components must work as a unified system to handle heavy precipitation. According to research from the Pacific Northwest National Laboratory, 1 inch of rain can deposit 1,240 gallons of water on a 2,000-square-foot roof (basc.pnnl.gov). Funneling that volume safely away from the house requires seamless alignment between roof runoff paths and wall drainage planes.

If rainwater escapes the roof surface and flows behind the siding, this barrier must channel the moisture down and away from internal framing.

Managing bulk water exposes a clear operational trade-off during tear-off:

  1. Stripping gutters and edge shingles first allows immediate structural assessment of the underlying wood.
  2. Fascia board and soffit repair must take place before fresh flashing is secured, ensuring clean anchoring for the final drainage elements.
  3. Aligning the wall drainage plane over edge flashings directs runoff away from the wall assembly rather than trapping it inward (nahb.org; media.iccsafe.org).

Once rotted fascia or soft roof decking shows up beneath old gutters, that is the point to bring in professional roofing help before advancing to exterior wall claddings.

Installation Sequencing for Critical Envelope Intersections#

Contractor installing house wrap membrane over stepped aluminum roof flashing along an exterior wall transition.

A successful exterior remodel requires a strict installation sequence: roofing first, siding second, and gutters last.

Roof Deck Prep and Flashing Integration at Sidewalls#

Correctly detailing the transition where a sloped roof meets a vertical wall prevents bulk water penetration. Step flashing is placed where a sloped shingle roof meets a vertical wall, with its bottom leg resting on the roof drainage plane and its upturned leg positioned behind the vertical drainage plane or sealed to it (www1.eere.energy.gov).

To maintain proper weatherproofing, the Pacific Northwest National Laboratory outlines that roof underlayment must lap a minimum of 6 inches up the sidewall over the weather-resistive barrier (basc.pnnl.gov). When installing sidewall flashing over a kick-out diverter, the first shingle and the next section of sidewall flashing must lap at least 4 inches over the diverter. Data from the International Code Council confirms that the wall drainage plane must lap over the top of the step flashing to direct wall runoff safely onto the roof shingles (media.iccsafe.org).

Overlap calculation:
Step flashing lap over diverter = 4 inches minimum
Roof underlayment lap up sidewall = 6 inches minimum

Installing siding before roofing forces contractors to pry against fresh siding, risking torn house wrap or improperly layered step flashing. Completing the roof first creates an unobstructed path for the wall drainage plane (media.iccsafe.org).

Kick-Out Flashing Placement and Weather-Resistive Barrier Lapping#

The junction where an eave meets a vertical wall is highly vulnerable to moisture failure. The Pacific Northwest National Laboratory points out that kick-out flashing must be placed at the eave edge of a roof-wall intersection to divert water running down the roof straight into the gutter, stopping spillage down the exterior siding (basc.pnnl.gov). These diverters can be fashioned on-site or installed as molded pieces sized for high rain volumes.

The International Code Council identifies reverse slopes as a primary failure mechanism in flashing assemblies, because slanting the material backward traps moisture and channels water directly inward (media.iccsafe.org). To prevent this, the kick-out diverter is installed flat against the roof and flush to the sidewall as the base piece of step flashing (basc.pnnl.gov). Integrating the weather-resistive barrier over the diverter's upright leg ensures that any water moving down the wall plane drains safely outside.

Evaluating Single-Contractor Coordination Versus Multi-Trade Contracting#

Hiring separate specialty trades often leads to scheduling delays, split blame, and disputed warranties. If a leak appears at a sidewall transition, the roofer may blame the siding installer, while the siding contractor claims the roof step flashing was installed incorrectly. Contracting the entire exterior through a single builder eliminates finger-pointing by placing complete warranty liability on one business.

Bundling the exterior scope also cuts mobilization expenses. A single general contractor manages on-site dumpster logistics, stages materials in one organized delivery, and coordinates labor without multi-week gaps between stages.

To determine the best approach for your home, review your project against these steps:

  1. Confirm that total exterior costs exceed $600.00 (michigan.gov) to ensure that only state-licensed contractors pull your building permits (michigan.gov).
  2. Require your contractor to provide license verifications covering roofing (Code M) and siding or gutters (Codes K and O) (cheboygancounty.net).
  3. Verify that the planned work schedule follows a strict sequence: roofing tear-off and replacement first, siding integration second, and gutters last.
  4. Schedule a professional exterior evaluation to inspect hidden components, including fascia integrity and attic ventilation, before signing separate trade contracts.

Homeowners in Northville, Novi, and Plymouth can take these criteria directly to their next project consultation. Evaluating your exterior as a single protective envelope keeps your home sealed and your warranties intact.

Michigan Residential Maintenance & Alteration Trade Classifications and Scope Provisions
Trade ClassificationMichigan License Letter CodeStatutory Scope & Incidental Work Allowance
RoofingMCovers roof assembly installation and repair; permitted to execute incidental and supplemental work in connected exterior crafts.
SidingKCovers exterior cladding installation and repair; integrates with adjacent flashing and drainage planes under combined contracts.
GuttersOCovers gutter and water drainage installations; permitted alongside roofing or siding when incidental or covered under qualifying trade licenses.
Critical Flashing and Drainage Plane Installation Specifications
Envelope ComponentMinimum Dimensional RequirementInstallation Function & Failure Risk
Roof Underlayment Lap at SidewallMinimum 6 inches up vertical wallMust extend over the weather-resistive barrier to prevent runoff from infiltrating wall sheathing.
Sidewall Flashing Over Kick-Out DiverterMinimum 4 inches overlapShingles and next flashing section lap over up-slope edge of diverter to direct bulk water into gutters.
Roofing Membrane at Intersections6 to 12 inches up vertical wallApplied at headwalls and sidewalls to seal transition joints before step flashing placement.
Unattached WRB Flap (Delayed Flashing)16 to 24 inches unattachedPreserves continuous shingle-lap drainage over kickout flashing if roof detailing occurs after wall wrap.
Flashing Slope DirectionPositive slope outward (no reverse slope)Directs water onto lower drainage planes; reverse slope acts as an injection path into wall assemblies.

Bundled Exterior Replacement Cost & Savings Estimator

Estimates the total cost and potential savings of bundling roof, siding, and seamless gutter replacement under a single Metro Detroit contractor compared to hiring separate trade contractors, factoring in combined staging, shared dumpster/debris logistics, and multi-trade efficiency discounts.

Estimated Separate Trades Cost: $33,750

Bundled Single-Contractor Cost: $30,375

Estimated Bundle Savings: $3,375

Frequently Asked Questions

Does a roofer replace gutters?

Yes. Michigan law allows licensed specialty contractors to handle additional crafts if the work is incidental and supplemental to their licensed trade, and residential maintenance licenses explicitly include roofing, siding, and gutter classifications.

Do roofers have to be licensed in Michigan?

Yes. Under Michigan law, contractors must hold a state license for any residential project where the aggregate contract price for labor, materials, and other items is $600.00 or more.

Do roofers need a license in Michigan?

Yes. State law requires residential builders or maintenance and alteration contractors to be licensed for any job totaling $600 or more. Detroit also mandates an active builder's license and municipal registration to pull permits.

Do roofing companies also do siding?

Roofing companies can also handle siding if their credentials meet state guidelines. In Michigan, specialty trade licenses identify roofing under Code M and siding under Code K. State statutory provisions allow a specialty contractor to execute a contract involving other crafts as long as that additional work is incidental and supplemental to their licensed trade. Managing roofing and siding under a single contract ensures structural transitions, like step flashing intersections, remain the responsibility of one team.

Disclaimer

This content is general information about roofing and home-exterior work and is not a substitute for an on-site inspection. Contact Horizon Roofing & Construction for advice specific to your home.

Sources